| Details | Additional information |
Country code | +61 |
|
Portability coverage |
|
|
Carrier coverage | Geographic and toll-free:
|
|
Documentation required by Bandwidth |
| Mandatory information on the LOA:
|
Documentation templates |
| |
Porting lead time | 35 business days | The lead times in Australia are longer due to multiple validation stages:
|
Porting time window | 8 AM to 10 AM AET | Complex ports are scheduled between 8 AM and 3 PM AET, with an additional 2-hour window available afterward. |
Port activation timeline | 8 AM to 10 AM AET |
|
Porting outside of business hours | Not supported |
|
Downtime expectations | There are reachability issues on the numbers throughout the porting window. |
|
Possible rejections |
| The rejections are typically received during the pre-validation stage. |
Porting holidays |
|
|
